home
contact us
quick quote request
hours & directions
download forms
feedback
Search:
Overview
Acceptance Criteria
Groundwater
Industrial Wastewater
Oil & Water Mixtures
Stormwater
Automotive
Marine
Miscellaneous Streams
Overview
Acceptance Criteria
Overview
Acceptance Criteria
Overview
Compliance Assistance
Contract Operations
Field Services
Overview
Newsletter Archive
Press Releases
In the News
Overview
Our Team
Mission Statement
White Papers
WATER & WASTEWATER
OIL
ANTIFREEZE
OTHER SERVICES
COMPLIANCE
NEWS
ABOUT US
Tank Replacement Project
A southeastern Massachusetts gas station was about to begin an underground storage tank replacement project when high groundwater conditions were discovered at the site. NewStream was able to treat more than 300,000 gallons of groundwater from this project in a 48-hour period.
Read More
Life Science Firm
A worldwide life sciences firm moved a membrane manufacturing process from another location to its New England manufacturing facility. The resulting waste stream posed certain challenges for the firm’s on-site wastewater treatment plant.
Read More
Metal Cladder
A clad metal manufacturer generates metal-bearing waste streams that vary in make-up depending on the product being manufactured at a given time. Changes in process chemistry occasionally result in waste streams that cannot be effectively treated by the company’s on-site treatment plant.
Read More
University Lab
During a year-long construction project, a university laboratory was disconnected from the university’s on-site WWTP. Because the lab wastewater could not be discharged directly to the sanitary sewer, the university was forced to find an alternative disposal option.
Read More
Manufacturer Adds New Product Line
A health and beauty product manufacturer introduced a new product line and was soon notified that they were in violation of their existing sewer discharge permit.
Read More
USS John F Kennedy
In March of 2007, the USS John F. Kennedy – the last conventionally-powered aircraft carrier built by the US Navy – made a final port visit to Boston before being officially decommissioned. While the ship was docked in Boston, NewStream received and treated over one million gallons of wastewater from its bilge.
Read More
Tank Replacement Project
A southeastern Massachusetts gas station was about to begin an underground storage tank replacement project when high groundwater conditions were discovered at the site. Significant dewatering would be required during the excavation, tank removal, and tank setting activities.
Water samples were obtained prior to construction and it was determined that the water was non-hazardous but would still require treatment. A permit for discharge to the local sanitary or storm sewer could not be obtained. In order to minimize the volume of water to be treated, vacuum trucks and frac tanks were staged at the job site and used around the clock for storage and transport to an off-site wastewater treatment facility. Because NewStream operates 24 hours, 7 days and offers an average 30-minute truck turnaround time, the contractor was able to minimize storage and transportation costs and to continue working at all hours of the day.
NewStream's significant storage and treatment capabilities allowed it to receive and treat more than 300,000 gallons from this project during a 48-hour period, while not interfering with our normal treatment and recycling activities. Built to world class standards by Texas Instruments, the NewStream recycling and disposal facility is highly adaptable to treat virtually any non-hazardous process, project, or liquid waste stream.